Highlights
You have completed the foundational estimates for the new office building in San Francisco. Now, your firm is looking to continue the estimation by calculating the concrete and steel takeoffs for the building.
Using the construction blueprints (the same construction blueprint you downloaded for Assignment 1) please calculate the following elements of the estimate:
The concrete takeoff for the footings and slab
o Provide the square footage of formwork
o Provide cubic yards of concrete
o *Please Note: The thickened edge of the concrete detail at the perimeter is 1 inch thick, 1 inch wide, and extends up to the slab at a 1:1 slope.
The needed square footage of the welded wire mesh
Quantity of anchor bolts
The steel takeoff for the entire structure (excluding metal decking and stairs)
o Provide the total weight of the structural steel in lbs
o Provide the total weight of the structural steel in tons
o Provide the quantity of roof trusses
This Engineering Assignment has been solved by our Engineering experts at My Uni Papers. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinctio.
© Copyright 2026 My Uni Papers – Student Hustle Made Hassle Free. All rights reserved.