BSBWHS616 - Apply Safe Design Principles to Control WHS Risks

Download Solution Order New Solution

Assignment Task

Read through the following instructions regarding choosing the two products that you will use for your assessment task. You are to assume your role is to provide advice to management about the safe design of the two products through all of its life cycle stages and in order to control risks.

Project

Safe design principles that should be applied to control WHS risks for two different products

Scenario

1: Construction of Foot Bridge Using Precast Members

In the aftermath of the rooftop parking deck debacle, Sky-line Builders embarked on a journey of continuous improvement, incorporating valuable lessons into their project delivery system for the construction of a new foot bridge. This time, they set their sights on constructing a pedestrian bridge connecting the shopping complex to the adjacent hotel.

To address the procedural shortcomings that had plagued previous projects, Sky-line Builders established a comprehensive quality assurance (QA) system. They appointed a dedicated QA manager responsible for implementing and overseeing standardized procedures throughout the project's lifecycle. The company instituted a rigorous and competitive bidding process for design services, ensuring that the selected design firm possessed a proven track record of delivering successful and safe bridge designs.

With a renewed focus on material quality, Sky-line Builders opted for the strategic utilization of precast concrete or steel members, carefully selecting the most suitable material for each specific work site. This decision was driven by the inherent advantages of precast construction, including enhanced precision, reduced construction time, and minimized onsite disruptions.

Clear assignment of responsibilities was paramount to the success of the new project. Skyline Builders fostered a collaborative environment between designers and construction teams, establishing regular meetings and open communication channels. During the construction phase, designers remained actively involved in addressing unforeseen challenges, meticulously monitoring and documenting any necessary design modifications. The peer review process was also bolstered, with a heightened emphasis on completeness and accuracy.

Recognizing the critical role of record-keeping, Sky-line Builders meticulously documented project activities, diligently recording all relevant statistics and quantifiable data. This comprehensive data repository laid a solid foundation for future assessments and continuous improvement initiatives. The company also ensured that all stakeholders involved in the project were protected by professional liability insurance coverage.

2: Sustainable Office Tower Construction with Integrated Technology

In the wake of a previous construction setback, Sky-line Builders embarked on a strategic shift, embracing sustainable practices and cutting-edge technologies. Their ambitious undertaking involved constructing a 20-story office tower within the heart of the shopping complex, seamlessly integrating green building principles with state-of-the-art construction techniques.

To address the procedural shortcomings that had hindered past projects, Sky-line Builders invested in the latest project management software and collaboration tools. This investment empowered the project team, comprising architects, engineers, and construction managers, to leverage Building Information Modeling (BIM) technology. BIM enabled the creation of a digital twin of the entire construction process, fostering clearer communication, enhanced collaboration, and real-time monitoring of project activities.

Recognizing the importance of transparency, Sky-line Builders adopted an open-book approach to the bidding process. This open-door policy fostered a competitive yet cooperative environment among design firms, stimulating the exchange of ideas and fostering innovation. Sustainability remained a cornerstone of the project, with a focus on procuring materials bearing eco-friendly certifications. The design incorporated sustainable features such as solar panels, green roofs, and energy-efficient systems, minimizing the project's environmental footprint.

To safeguard against design flaws, Sky-line Builders implemented a rigorous quality control system that included continuous peer reviews. Regular site inspections and audits ensured adherence to design specifications, preventing costly rework and delays. Additionally, the project featured a comprehensive training program for construction personnel, encompassing the latest construction methods and safety protocols. This commitment to continuous improvement instilled a culture of excellence within the workforce, minimizing risks and promoting project success.

This BSBWHS616Engineering has been solved by our PHD Experts at My Uni Papers.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.