Assignment Task

Learning outcomes for the assessment (refer to the appropriate module learning outcomes)

Students will be able to demonstrate the following:

• To gain comprehensive understanding of advanced techniques of reliability engineering;

• To organise the collection of plant data and undertake an analysis of it which will facilitate the diagnosis of reliability problems and their effective elimination;

• To apply and critically evaluate the most appropriate of the currently available techniques for reliability assessment.

 

ASSIGNMENT

A company which produces railway sleepers for rail infrastructure projects, is seeking to improve its product quality and reliability. The company has provided the following qualitative and quantitative data related to its current operation. Prepare an individual report to carry out the evaluation and answer the following four questions.

 

Q1. The company has kept at one of its plants 24 months records of the total number of failures occurring each month, as shown in Table Q1. Produce the 3-month moving average and the 6-month moving average plots, together with the CUSUM plot (if the target value is 15).

 

Q2. A machine in the company has an MTBF of 380 hours and an MTTR of 20 hours.

1) Calculate its availability for the original system.

2) A second active parallel system will be acquired if the availability of the original system is lower than 99%. Do you think one additional will be sufficient? If so, what is the improved availability for the new system? Justify your answer.

3) If the additional machine costs £180,000 and the downtime costs £5000 per hour, what is the payback period of the additional machine?

 

Q3. Using the system reduction procedure, calculate the reliability of the independent system as shown in the form of a Reliability Block Diagrams below (Figure Q3). Illustrate how the Reliability Block Diagrams are simplified. The reliabilities of all units are shown in the diagram.

 

Q4. In a reliability test in the company, the time-to-failure values of ten mechanical items of the same design running under identical condition were recorded and are as given in the following table (Q4):

Using the median rank method for estimating the failure probability and assuming that the guaranteed life before failure is 1500 hours,

a) Calculate and tabulate the median ranks for the data supplied.

b) Plot the cumulative percent failure versus time to failure on the Weibull graph paper supplied.

d) Estimate the reliability of an item at 2300 hours, its failure probability between 2300 and 2400 hours, and the probability that the item that is functional at 2800 hours will fail before reaching 2900 hours.

 

This MN5554–Engineering Assignment has been solved by our Engineering Experts at My Uni Papers. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered.

You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.