Box Hedge Residence Case Study & Building Code of Australia in Construction Work Engineering Assignment Help

Download Solution Order New Solution
Assignment Task
 



Scenario
You have submitted a quote to construct a home for Mr and Mrs Smith for $460,000 on their land at 1 Vacant Space, Box Hedge NSW. Use the plans for the Coomera Waters Residence as the Plans for this project.
The home is single storey, slab on ground construction with:

  • brick veneer walls
  • concrete tile roof
  • aluminium framed windows
  • four (4) bedrooms
  • two (2) bathrooms
  • kitchen/family/living room


Mr and Mrs Smith have decided that they want to change the Lounge (as identified on the plans) to a Home Theatre Room.  Mr and Mrs Smith plan to get a swimming pool installed by others at the same time as the house is being built. Mr and Mrs Smith have accepted your quote and wish to proceed.
Task:
Create a project file for this project. The file is to be on your computer and should include a series of folders in a structure that is clear and easy to use. In the table provided below, explain the file structure that you have created, including key folders, their sub-folders and any sub-sub-folders that you will create. Provide a list of the documents that will be in each folder.

Scenario:
Construction has commenced on the Box Hedge residence for Mr and Mrs Smith. Three (3) weeks into the construction, Mr Smith contacts you requesting that the glazing to all windows and doors be changed from clear to Viridian Smartglass. Luckily, you have not yet placed orders for the windows and doors. Your research and subsequent calculations shows that the variation will result in an additional $4,400 to the contract price. Mr Smith responds to your written advice of this, accepting the change and instructs you to go ahead.
Task:
Prepare a schedule (call forward sheet) for the project, including identifying when orders need to be placed and when they need to be delivered to site.
Prepare a Labour Order by email or contract variation, requesting the work to be done by a Carpenter.
Prepare a variation and instruction sheet for the change requested by Mr Smith.
Prepare a communication (in writing, which can be provided to workers on email or in person) on the impact of the variation on the construction schedule. 
Upload the Call Forward Sheet, Labour Order, Variation and Instruction, and Communication to Workers in the space provided below.

 

  • List at least five (5) documents that should be included in the site supervisor's file when preparing a file for construction.
  • Why is it important to produce a program for the construction work?
  • Explain the purpose of establishing a cost control/reporting system for any construction project or group of projects.
  • Why should you review costs on completion of all construction projects?
  • In your own words, define Defects Liability.
  • How can the estimator assure the site manager that any imposed conditions from the local council have been incorporated within the project schedules prepared for a project?
  • Completing a construction contract on time is important. List two (2) possible consequences of the contract period being overrun.
  • When you check your cost plan, you notice that the actual cost of the timber on a project has exceeded the estimated cost. What action would you take?
  • List what you would consider when selecting new material for a job
  • For what purpose would a roof overlay drawing prepared by the estimator/scheduler be helpful to the supervisor or onsite tradeperson?
  • In your own words, describe what a nominated supplier and a subcontractor is.
  • Explain in your own words, the purpose of the Building Code of Australia in construction work.

    


This Engineering Assignment has been solved by our Engineering Experts at onlineassignmentbank. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
    
Be it a used or new solution, the quality of the work submitted by our assignment Experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Get It Done! Today

Country
Applicable Time Zone is AEST [Sydney, NSW] (GMT+11)
+

Every Assignment. Every Solution. Instantly. Deadline Ahead? Grab Your Sample Now.